How To Move Task Within An Existing Task List In Project 2010

This article explains how to move task within an existing task list in Project 2010.
  • 2355

Introduction

Process used for move a task within an existing list in Project 2010 is given below.

Step 1

Select an entire task with a click on its row heading.

 select-task-in-project 2010.jpg

Step 2

Drag the task to its desired position indicated by the line cursor.

 drag-task-in-project 2010.jpg

Step 3

Then drop the task at his new position.

 drop-task-in-project 2010.jpg